![]() ![]() and State Highway 77 in San Benito, Texas, to a new Kingfisher Station that will be constructed and owned by Sharyland Utili. Residents may also contact the transmission line project manager, Mr. The project is a new proposed 345 kilovolt (kV) transmission line that will connect the existing La Palma 345-kV Station owned by American Electric Power Texas (AEP Texas) located south of the intersection of W Stenger St. Concerned residents can find additional information concerning the Oncor transmission line project at. The existing line was originally built in the 1950’s and will be rebuilt as a 345 kV line to better align with Ameren Illinois current energy system and to create additional customer benefits. Public opinion is a factor in this discussion. On January 12th, 2023, the Town Council unanimously passed a resolution to pursue a southern route for the transmission line. Construction further south in Town would minimize community disruption. Mayor Rettig and the Town Council have worked with other affected municipalities to find alternate routes. ![]() Unfortunately, the proposed routes through Northlake territory threaten to disrupt established communities and future business developments. The transmission line will begin in the City of Rhome, pass through the Town of Northlake, and end in the Town of Flower Mound. ![]() One infrastructure project is the Ramhorn Hill – Dunham 345 kV Transmission Line Project, which is pending construction by the Oncor Electric Delivery Company. 345 kV and above, the measurements were limited to 345-kV, 60-Hz. Using the Oncor contact information below, please provide comments and concerns before Friday, January 20, 2023.Īs energy demands grow within the Dallas-Fort Worth area, additional electricity infrastructure must be built. Because electric field strengths are the greatest for transmission lines voltages of. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |